It varies with the site. Piers advance until they reach competent strata (dense glacial till, limestone, or shale), which in Greater Cincinnati is commonly 15 to 40 feet down. Hillside lots with deep fill or weathered Kope shale reach the deeper end. Each pier is load-tested to confirm it reached capacity.
More detail
There is no fixed pier depth, because piers are driven until they reach soil or rock strong enough to carry the structure's load, and that depth depends entirely on what is under your specific lot. In Greater Cincinnati, piers commonly reach competent strata, dense glacial till, limestone, or unweathered shale, somewhere between roughly 15 and 40 feet down, though the actual number is determined in real time during installation rather than predicted exactly in advance. The geology drives the variation. On a lot where firm strata sits relatively shallow, piers reach refusal sooner. On hillside lots in areas like Price Hill, Mt. Adams, or the Covington hillsides, where there can be deep deposits of fill or thick weathered Kope Formation shale above the competent rock, piers run to the deeper end of the range to get past the unstable material. This is one reason hillside pier projects can cost more: more pier pipe and more installation time per location. The important quality-control step is that each pier is load-tested at installation, the crew confirms it can hold typically 1.5 to 2 times the design working load before locking it off, so reaching adequate depth is verified, not assumed. For helical piers, capacity is verified by installation torque, which correlates to load capacity, rather than by push-to-refusal, but the principle is the same: the pier goes as deep as it needs to reach strata that will not move, and that capacity is documented. The closeout package records the depth and the load test or torque at each pier, so you have a permanent record of exactly how deep your piers went and what they can carry. A contractor quoting a flat pier depth for every house regardless of the soil is not accounting for how the systems actually work.